    Lake Washington High School Addition

    Block 7: Occupancy

     

    Lake Washington High School classroom addition


     

    Project updates

    LWHS world class learning environment new additions video

    Thanks to the 2019 Capital Construction Levy, Lake Washington High School has completed projects to add more space for students in class, in the new auxiliary gym and while they are in the commons area. 

    The new North Wing on campus added 20 new “world class” classrooms and shared space. The new classrooms were built with a focus on math, science, and Career and Technical Education (CTE) classes.

    In April 2019, voters approved a capital construction levy that is providing $120 million in funding, collected over six years. These funds, combined with state construction assistance funds, will provide a total of $144 million. As of March 2021, $73 million has been spent on these levy projects:

    Twain Elementary 2021 update

    Workers are in the process of installing the wood floor at the new auxiliary gymnasium at Lake Washington High School. Sprinkler and electrical installation have begun and interior painting is underway. The school will be able to start using the gym for physical education classes and other athletic needs in the fall.

    LWHS Science Labs

    Why is slime stretchy? How do chickens flap their wings? 

    With these questions in mind, two science classes at Lake Washington High School celebrated the last week of school by setting up lab experiments. The labs also gave students a chance to use the new equipment in two of the school’s 20 new classrooms.

    Exterior glass and brick

    The roof installation at Lake Washington High School auxiliary gymnasium is complete, protecting the building from rain and other weather. Exterior walls, including brick, concrete masonry, and the glass/aluminum wall system are installed, which will allow interior construction to progress. Circular solar tubes reflect light into the gym naturally during the day. Installation of interior building systems – including electrical, data, plumbing and mechanical – is in progress. The gym is scheduled to open in fall 2021.

    Progress photos

     


    Aerial photos




    Drawings and site plans

     

    Project information

    Architect: McGranahan Architecture
    Contractor: Lydig Construction
    Location: 12033 NE 80th St, Kirkland, WA 98033
    Spaces: 20 classrooms, including general, science, CTE and teacher planning spaces; auxiliary gymnasium and commons space
    Current Portables: 10 classroom portables currently at LWHS will be relocated to Rose Hill Middle School, Kirkland Middle School and Inglewood Middle School after construction
    Planned opening: New classrooms: Fall 2020; Auxiliary gymnasium and commons space: Fall 2021

    Sign up to receive email updates about this project.