Bond & Levies Q&A
Lake Washington School District has three ballot measures on the February 2018 ballot: the second of four planned bonds and two replacement levies.
Below are answers to some common questions. Additional information can be found on the Bond & Levies web page.
- School Funding
- Taxes
- Educational Programs & Operations (EP&O) Levy
- Capital Projects Levy
- Bond to Reduce Overcrowding and Enhance Student Learning Environments
- Impact on Schools
- Voting
- Building Cost-Effective and Efficient Schools
School Funding
- Why does the district have to ask for money?
- Didn’t the state fully fund education with the McCleary Plan? Why do you still need an “Educational Programs & Operations Levy”?
- What extracurricular activities and athletics are funded by the EP&O Levy?
- How much of the new state money is going to reduce class size?
- Shouldn't the EP&O amount go down as state funding goes up?
- How did the district determine how much to ask for?
- Don’t developer impact fees help pay for new schools needed for growing enrollment?
- Doesn’t the state provide money for new school buildings?
Why does the district have to ask for money?
State funding provides a little more than 70% of the district’s funding for operations. Federal funding covers just 4.4%. The district currently depends on the Educational Programs and Operations (EP&O) levy for 19.2% of its operating costs. That money fills the gap between state funding and the cost of today’s education programs and support.
Neither state nor federal money is available for the bulk of capital costs, like buying computers or renovating buildings. Local districts are responsible for raising their own money to provide 21st century learning tools and to protect the taxpayer’s investment in our school buildings through proper long-term maintenance and upkeep. The district depends on the Capital Projects levy and Bonds to fund technology, facilities, and school construction.
Didn’t the state fully fund education with the McCleary Plan? Why do you still need an “Educational Programs & Operations Levy”?
While the state’s McCleary plan does provide additional funding, the majority of which is earmarked for Basic Education staff salaries, there are many areas that remain underfunded by the state, including: Special Education, Highly Capable, English Language Learners, Transportation, and Substitutes. In addition, the district will always need local levies to fund local district programs and priorities which are not considered to be Basic Education and will never be funded by the state including: professional learning, athletics and activities, extracurricular activities, additional courses (7-period day).
Read about the McCleary Plan and how it impacts Lake Washington School District.
What extracurricular activities and athletics are funded by the EP&O Levy?
The district athletic programs include its sports programs at high school and middle school such as football, basketball, wrestling, soccer, volleyball, track, tennis, swimming, etc. The extracurricular program includes clubs such as honor society, drama, debate, journalism, advisory, yearbook, drill team, etc. Funds pay for athletic and activity program coordination, coaching stipends, officials, security, transportation, pool rental, etc.
How much of the new state money is going to reduce class size?
None of the new state money districts receive is for reduced class size. The increased funding is related to salary and benefits that the state has been underfunding and districts have had to pay for out of local levies. The new funding still does not provide for full funding of the actual costs for the educational program.
Shouldn't the EP&O amount go down as state funding goes up?
How did the district determine how much to ask for?
The district assessed overall needs and reviewed projections of state funding. We then worked with the Bond and Levy Advisory Committee to make a recommendation to the school board. The Advisory Committee included parents, community members, city staff, and Long-term Facility Task Force representatives. The school board voted to approve the three measures that will appear on the ballot.
Don’t developer impact fees help pay for new schools needed for growing enrollment?
Impact fees are collected and approved by each jurisdiction. (See the current Capital Facilities plan for more details.) While impact fees are intended to help offset the impacts of new schools needed for development, they do not cover the entire cost. The impact fees in 2018 are $11,954 per single family residence and $733 per multi-family residence. A 100-home single family home development would generate about $1.2 million in school impact fees while a 400-unit apartment complex would pay approximately $293,000. For comparison, it costs about $47 million to construct and equip a new elementary school.
So, these fees can help fund a portion of construction but do not cover the entire cost. They can also be used for temporary housing as students from new development often arrive at schools before new schools can be built, although impact fees collected from 2016 through 2020 are committed to help fund 2016 Bond projects. Also, keep in mind that families moving into new developments are not the only source of growing enrollment. Increased births in King County generally have resulted in larger incoming classes moving through the system. Families with young children who live in existing housing do not generate any impact fees.
Doesn’t the state provide money for new school buildings?
If the district can secure local funding, the State offers some potential construction funding assistance for the modernization of school facilities on a 30-year cycle. However, it only pays for a portion of some of the project components. The district has received between 8% and 12% of the cost of recent projects in state assistance funding. However, state funds are not guaranteed and are available only if the legislature provides adequate funding for schools that qualify. Despite impact fees and state funding, the district still must come up with most of the cost of new schools or replacement school buildings.
Taxes
- What is a tax rate?
- How do school district taxes work?
- What is the district's financial management history?
- How much will this cost me?
- What happens if our property values increase? Will my taxes go up?
- What is included in my total tax bill?
- Is there a tax break for senior citizens?
- How does the LWSD tax rate compare to neighboring districts?
What is a tax rate?
How do school district taxes work?
School bonds and levies authorize only the collection of the specific dollar amount approved by voters. This fixed amount is shared by local taxpayers and is divided among individual businesses and property owners, based on the value of their property. Only the amount of money approved by voters is collected. As overall assessed value increases, tax rate decreases.
What is the district's financial management history?
Lake Washington School District has the highest credit rating assigned to any school district in the state. Standard & Poor’s has assigned the district an AA+ rating. This rating has only been assigned to three districts: Lake Washington, Issaquah and Bellevue. Moody’s Investors Service has assigned the district a Aaa credit rating, the highest rating possible. Less than 0.45 percent of school districts in the nation hold this rating from Moody’s. These high credit ratings allow the district to take advantage of the lowest interest rates possible. In addition, our district consistently has clean state audits.
The district has also received the Pathway to the Meritorious Budget Award (MBA) from the Association of School Business Officials International. This award recognizes excellence in school budgeting presentation.
We have saved taxpayers over $24 million through bond refinancing in the last three years. We have also saved over $11.4 million in utility costs due to our resource conservation management program. Our building designs create savings through efficient HVAC systems, solar panels and high efficiency plumbing fixtures. We are a seven-time winner of the King County award for Waste Prevention and Recycling.
How much will this cost me?
The two levies are replacing levies that will expire. Overall, all three measures (the two levies and the bond) result in a $0.23 decrease per $1,000 of assessed value (from the current $3.16 to $2.93 per $1,000).
Per $1,000 of Assessed Value
-$0.23
The table below shows the estimated tax savings due to the rate decrease.
What happens if our property values increase? Will my taxes go up?
The ballot measures specify a total amount of money that can be raised. If property values in the district rise, the tax rate per $1,000 assessed valuation will decline, as the total amount of taxes collected remains the same.
Tax rates also go down when new residential and commercial property is built in the district. Those new property owners help share the payments, reducing the amount you have to pay. For example, if the district had only four residents and needed to raise a dollar, it would ask each resident for 25 cents. But if another house was built, it would only need 20 cents from each of the five residents to raise the dollar.
The LWSD tax rate today is $3.16 per $1,000 of assessed value. The total tax for all three measures will be reduced from the current amount to $2.93 per $1,000. The example below shows the calculation of total taxes for an individual homeowner. Assessed value of $700,000 divided by 1,000 = 700. Then multiply 700 by the total tax rate of 3.16 for a total tax of $2,212.
2018: | $700,000 | ÷ 1,000 | = 700 | x 3.16 | = $2,212 |
2019: | $735,000* | ÷ 1,000 | = 735 | x 2.93 | = $2,154 |
*Assumes 5% growth in assessed value from 2018 to 2019.
Here is how you can calculate your taxes for 2018 and 2019:
2018: | Your Assessed Value | ÷ 1,000 | = _______ | x 3.16 | = ________ |
2019: | Your Assessed Value | ÷ 1,000 | = _______ | x 2.93 | = ________ |
What is included in my total tax bill?
Your tax bill is a combination of state and local taxes. School taxes are a portion, but you also pay for things like hospitals, fire and rescue, libraries, regional transportation packages, and many other services. Individual changes in assessed value or passage of non-education initiatives can affect your total tax bill.
The King County Assessor’s website allows you to view your 2018 taxes through their Parcel Viewer application: https://www.kingcounty.gov/services/gis/Maps/parcel-viewer.aspx.
You will see an increase in the “State Schools” portion of your 2018 taxes. Due to the McCleary Plan, the state is raising the state property tax rate to provide more funding for Basic Education for every child in Washington state. The Supreme Court ordered the state legislature to provide more funding for schools. This state property tax increase is going to all 295 districts in Washington state; it is not all coming to LWSD.
The table below shows the estimated tax increases due to the state schools portion. These funds do not go directly to LWSD, but rather to fund education across Washington state.
LWSD is decreasing the local tax rate beginning in 2019. School districts rely on local levy funds to fund operations, programs, staff, technology and classroom space – all items that are not funded by the state. The McCleary Plan does not provide all the funding needed for students and schools. In fact, the legislature authorizes districts to collect local levy dollars for items not funded by the state.
Is there a tax break for senior citizens?
Yes. Senior citizens and people with disabilities may be eligible to receive a reduction in property taxes based on income. Property tax information is available on the King County website.
How does the LWSD tax rate compare to neighboring districts?
Educational Programs & Operations (EP&O) Levy
- We want to ensure our students have access to staff, programs, and course offerings to be successful and graduate future ready.
- The Educational Programs & Operations levy funds program and operations needs not funded by the state.
- The levy expires every four years.
- The 2018 levy replaces the expiring levy and decreases the tax rate.
- What does the EP&O levy pay for?
- How much does the district rely on this levy?
- How much can we ask for in the EP&O levy?
- Since the district is seeking less than the full amount authorized, does that mean they will be eligible for less state funding?
- Does OSPI limit what districts receive from the state based on past spending?
- How much new money is the district receiving from the state?
- Why is this levy called Replacement of the Existing Educational Programs and Operations Levy? Doesn’t the legislature say the levies are now called “Enrichment” levies?
- Why is a 7-Period day needed for high school students?
- How much will the EP&O Levy Cost?
What does the EP&O levy pay for?
This money fills the gap between state basic education funding and the current educational program. Among the items it helps pay for are:
- Staffing for programs to meet student instructional needs, such as Special Education, Highly Capable, and English Learner programs.
- Staffing for safety and security, including substitutes, nurses, health room staff, and campus security staff.
- Staff professional learning, teacher planning and preparation time, New Teacher Support Program, training, and workshops.
- Extracurricular activities and athletics.
- Additional course offerings, such as a 7-period high school day to support graduation requirements and summer learning.
- Early Learning programs, such as Special Education Preschool, Ready Start, and Head Start.
The chart below shows the portion of funding from state/federal resources and the portion that is funded from the local levy.
How much does the district rely on this levy?
How much can we ask for in the EP&O levy?
The state legislature limits what local school districts can collect through their EP&O levy. Districts can collect either $1.50 per thousand of assessed valuation (AV) or $2,500 per student, whichever is less. For Lake Washington, the $2,500 per student amount is less. The district is asking for less than this amount, or approximately $2,149 per pupil due to anticipated additional state funding. This levy will allow the district to maintain our high-quality programs and add a 7-period day for high school students. We cannot legally collect more than the maximum amount the state allows. Nor can we use money from capital project funds or bonds to pay for general operations. Read more about the McCleary Plan and how it impacts Lake Washington School District here.
Since the district is seeking less than the full amount authorized, does that mean they will be eligible for less state funding?
Does OSPI limit what districts receive from the state based on past spending?
How much new money is the district receiving from the state?
Why is this levy called Replacement of the Existing Educational Programs and Operations Levy? Doesn’t the legislature say the levies are now called “Enrichment” levies?
By statute, the ballot title must be approved by the King County Prosecutor’s Office. The King County Prosecutor’s Office approved that districts could continue to use the terminology of “Education Programs and Operations” levy and authorized the ballot title and the language in the ballot stating that “these funds support the educational program and operations, which are not funded or not fully funded by the state.” This levy is called a replacement levy because districts are required to renew their levies every four years. The levy that voters approved in 2014 is expiring and the levy that we are asking voters to approve in 2018 is a replacement of that levy although at a lower amount.
Why is a 7-Period day needed for high school students?
Currently, our high schools have a 6-period schedule. In a 6-period schedule, students can earn 6 credits per year for a total of 24 credits over 4 years.
In a 7-period schedule, students can earn 7 credits per year, for a total of 28 credits over 4 years.
A 7-period schedule provides more opportunities for students to prepare for college, career, and their future. A 7-period day provides students more opportunities to explore their interests and passions through elective courses, opportunities to access rigorous coursework, more options and fewer conflicts for the courses they want to take, and increased access to intervention and support, including credit retrieval.
How much will the EP&O Levy Cost?
Capital Projects Levy
- We want to ensure our students have safe school facilities and access to technology for learning.
- The capital projects levy funds critical facility and technology needs not funded by the state.
- The levy is on a four-year replacement cycle.
- The 2018 levy replaces the expiring levy with no tax rate increase.
Capital Projects Levy - Technology
- Why do we need a capital project levy for technology?
- What does the Capital Projects Levy pay for?
- Why do students and the district need technology?
- How many computers are used by students in the district?
- My student’s computer is not fast enough. Is anything being done?
- What is the process to update student laptop computers?
- Why can’t students use their own computers for school?
- My student has a smartphone that could be used for schoolwork as well as personal use. What is the LWSD policy for using smartphones?
- Will classroom technology be updated?
- My student has commented that internet access at times is very slow. What is the District doing to improve performance and availability?
- I hear the term “Cloud” being used to describe where data is kept. What is the LWSD strategy for using cloud technologies?
- Will using cloud technology impact my student?
- How can students access documents and synchronize them with their home computers?
- How does LWSD protect my student’s information?
- What is the LWSD policy on software for students?
- Will there be improvements in the ways my student and I get help and access information?
Why do we need a capital project levy for technology?
What does the Capital Projects Levy pay for?
Why do students and the district need technology?
We are preparing today’s students to be future ready – ready for college, the workplace, and personal success. Technology touches every aspect of our lives now and more so in the future. At school, much of the curriculum, instructional tools, research, homework, testing, and communication are digital. Our students will be comfortable and successful with technology no matter what path they choose after graduation.
On the operational side, the district is a large enterprise and like any large organization, it relies on technology for communications systems and web presence, employment and financial systems management, transportation, food service, recordkeeping, and training and managing a large employee base in distributed locations spread over 75 square miles.
How many computers are used by students in the district?
There are approximately 25,000 computers for student use across the district. Of these, 22,000 are part of the Mobile Access for Students program. They are deployed to every student in middle and high school and shared in a cart-based model in elementary schools.
Currently, students in grades K-2 share cart-based laptops on a ratio of three-to-one. Grades 3-5 share on a ratio of two-to-one. A capital projects technology levy would improve ratios to one-to-one for fifth grade students. Fifth graders rely more heavily on digital curriculum and tools than younger grades.
My student’s computer is not fast enough. Is anything being done?
The 2018 levy provides funds for newer equipment, which will include faster processing capabilities as it becomes affordable. Procurement efforts prioritize an equitable experience for all students. Procurement criteria includes durability, processing capacity, long battery life, weight, brand reputation, availability of parts, local warranty and repair, cost, and future-proofed features, such as touch or digital inking. Other critical considerations are to ensure the student laptops can run a myriad of applications, adopted curriculum, and state assessments, and handle required security software/settings. The district adopted the Microsoft platform in 2002 and has been building its teachers’ skills and adopting curriculum and instructional tools for this platform since that time.
What is the process to update student laptop computers?
Each spring, available student laptop models are reviewed and purchases are made for incoming sixth and ninth grade students for the following September. These students then retain those laptops for their middle and high school careers. Approximately 25% of elementary cart-based laptops are refreshed annually. It is possible to get more than four years of life from a cart-based device and each year the remaining life of cart-based devices is assessed before retiring the devices.
In addition to student laptops, the 2018 technology capital levy includes a plan to replace all district laptops and desktop computers. If not refreshed, current devices will be between 8-11 years old at the end of the levy in 2022.
Why can’t students use their own computers for school?
There are several reasons why we provide the same computing devices to all students in school. They include safety, instruction, licensing, technical support, and equity. Students are not precluded from bringing their personal devices to school, however, students who bring personal computers:
- Must also bring their district computer fully charged and available for use when required by the teacher.
- May access the Internet only through guest wireless network, where filters are set to the level of protection needed by an elementary student.
- Will not receive technical support or assistance with personal computers.
- May not access printing or charge their personal computer at school.
- Do so at their own risk. The district is not responsible for lost or stolen personal computers.
My student has a smartphone that could be used for schoolwork as well as personal use. What is the LWSD policy for using smartphones?
LWSD recognizes the increasing capabilities of smartphones and widespread use by students. LWSD is focused on the student laptops as the primary instructional tool due to limits of smartphone functionality on the district’s secure networks and incompatibility with many curricular applications and tools.
Will classroom technology be updated?
One of the items funded through the 2018 levy is the update to classroom technology. Classrooms throughout the district will have new interactive presentation equipment replacing 10-year-old interactive panels that have reached end of life. Audio amplification systems and other classroom presentation tools will also be maintained and replaced as required.
My student has commented that internet access at times is very slow. What is the District doing to improve performance and availability?
The 2014 levy funded district-wide wireless and wide area network upgrades. These projects have been underway for two years and are scheduled to be completed in August 2018. Speed and wireless connectivity have already improved in most buildings. Upon completion, speed between buildings will be at 10gbs and district capacity will be 40gbs. This improved performance, coverage, and capacity will handle growth in demand for video-based content, interactive web-based applications, high definition audio, and digital instructional programs. The 2018 levy request will provide updates for wireless access points in 2022 that will keep pace with ever increasing digital demands.
I hear the term “Cloud” being used to describe where data is kept. What is the LWSD strategy for using cloud technologies?
Will using cloud technology impact my student?
How can students access documents and synchronize them with their home computers?
There is no need to synchronize to home computers to access documents. Students use the Microsoft cloud, specifically Microsoft Office 365, which allows them to save their files to a location (in the cloud) that is fully accessible from any Internet-connected device with appropriate user name and password. In addition, the web-based PowerSchool Learning system allows teachers to post information for students and allows students to directly save their assignments where only the teacher can access them.
How does LWSD protect my student’s information?
Protecting student privacy and restricting access to student data is a critical responsibility for the district. In today's digital world, threats can come from external hackers and malware. Threats can also come from our own staff and students through things like sharing passwords.
The district employs a layered approach to security. It starts with the Windows Active-Directory-based authentication. Currently, passwords are required to be changed every 90 days. Passwords must meet the standard for what is considered a strong value to protect against hacking attacks. Additional layers of access controls and application-specific authentication are used throughout the systems. The intention is to reduce complexity and the number of authentications where possible, but not at the expense of security or privacy. Deep packet inspection is done to monitor network traffic for attempted breaches, activity on the network that looks suspicious, and to record access to data.
LWSD constantly strives to improve the security methods as new tools become available and best practices in the industry evolve with the threats. In addition, the district ensures it is compliant with federal and state student privacy regulations.
What is the LWSD policy on software for students?
Student computers are built with a standard set of software to meet instructional, productivity, and network security requirements. The district maintains control of software and administrative settings on LWSD computers to insure we remain in compliance with our licensing agreements with vendors and as a part of our overall security efforts.
Will there be improvements in the ways my student and I get help and access information?
Each middle and high school has a student support desk, typically located in the library. The staff at the school work directly with students at this desk. Technology support staff visit each day to manage equipment troubleshooting and repair. Parents can find help with technology by emailing parentquestions@lwsd.org. This service is available 24x7.
Capital Projects Levy - Facilities
- Why do we need a capital projects levy for facilities?
- What does the Capital Projects Levy pay for?
- How are projects or facilities selected to be funded by the capital projects levy?
- Why do you have the standards you do for fields and gyms, such as sand-based fields, smaller gyms and baseball/softball fields without artificial turf?
- How does the district plan for facilities?
- How will the Capital Projects Levy impact safety?
- How much will the Capital Projects Levy Cost?
Why do we need a capital projects levy for facilities?
The capital projects levy is designed to cover projects that focus on individual systems, such as a roof, flooring, or heating improvements that are at the end of their useful life. The projects include items that wear out much faster than an entire school building. For example, a school furnace will wear out faster than the whole building. Other projects improve safety and accessibility, improve energy efficiency to help reduce utility costs, and keep building systems operating.
What does the Capital Projects Levy pay for?
How are projects or facilities selected to be funded by the capital projects levy?
Why do you have the standards you do for fields and gyms, such as sand-based fields, smaller gyms and baseball/softball fields without artificial turf?
District standards are determined to best balance needs and available resources. District operational funds support the present standard for sand-based fields at elementary schools. We cannot maintain natural grass fields due to the amount of use and winter weather. We also need to provide field space that can be used throughout the entire winter. Because of the Northwest weather, sand-based fields are the best fields to support year-round play. The district standard for gyms and fields is based on the educational program of the school, not after-school sports competitions needs or community use.
How does the district plan for facilities?
The district maintains an annually updated Six-Year Capital Facility Plan that looks at demographics, enrollment projections, and programming to help determine potential capacity needs. Capacity needs determine additional space needs at existing schools, and possibly new schools, based on established capacity standards.
Annual assessment of the condition of all school buildings is conducted as part of the district’s Asset Preservation Program. In addition, the district is involved in continuous life cycle planning. This planning informs planned maintenance and levy measures to help ensure uninterrupted building operation. Criteria and standards for building and site systems have been developed to efficiently leverage resources, while at the same time meeting the priorities and mission of the district.
How will the Capital Projects Levy impact safety?
The levy provides funds to update fire alarms and security systems, improve ADA access, site access and vehicle flow in student drop off/pick up areas. It will expand lockdown hardware and window treatments to shared instructional spaces. It will also enhance campus security by expanding security cameras to choice high schools and comprehensive middle schools.
How much will the Capital Projects Levy Cost?
Bond to Reduce Overcrowding and Enhance Student Learning Environments
- In April 2016, voters passed the first of four planned bond measures to fulfill the Long-Term Facility Task Force recommendations.
- Lake Washington is building more schools and classrooms needed to support our growing enrollment.
- Student enrollment in LWSD continues to grow and we want to provide students with the best learning environments possible and provide classrooms for our ever-growing student population.
- The 2018 bond maintains the current rate with no tax rate increase.
- Why does our district need a school bond?
- How were the projects selected?
- What will the proposed bond pay for?
- What are the estimated project costs?
- When would the schools be completed?
- Where will the new schools be located?
- How will the new elementary school affect the overcrowding in other elementary schools?
- How do you know how many more students are coming?
- Can’t you just add more portables if you need more space?
- Why are you adding Choice Schools at the high school level? Why not a neighborhood school?
- Why do you have to add on to Lake Washington High School now, when the school was just completed a few years ago?
- How will the decision be made to replace a building vs. remodel the building?
- Why do you need portables? Why do schools sometimes open with portables?
- What are the advantages of rebuilding a school?
- Are fields, stadiums, and other sports facilities included when a school is rebuilt?
- What is the term of the bonds? When will these new bonds and all the old ones be paid off?
- How much will the Bond measure cost?
Why does our district need a school bond?
How were the projects selected?
In 2014, the district formed a 63-member Long-Term Facility Task Force to help develop a plan to address the district facility challenges. The Task Force reviewed the district’s facility needs and developed recommendations to reduce overcrowding, accommodate growing enrollment, and continue to provide quality learning environments and experiences for our students. Staff and community members provided feedback throughout the nearly year-long process.
In November 2015, the Task Force recommended a long-term strategy through 2029-30, which prioritized building new schools and enlarging aging schools to address capacity needs. A Bond Advisory Committee helped develop the funding plan to implement the long-term facility recommendations. The funding plan included an April 2016 bond that was passed by voters, a 2018 bond this February and future bonds planned for 2022 and 2026.
What will the proposed bond pay for?
It will provide classroom space for 2,100 students by:
- Building two new schools – one elementary and one choice high school
- Rebuilding and enlarging Alcott Elementary and Kamiakin Middle School
- Building an addition to Lake Washington High School
Other projects include land for new buildings, special education learning spaces and other capital projects.
What are the estimated project costs?
Total cost for all the projects is $314 million, allowing for construction inflation, sales tax, and other fees in addition to construction costs. These project cost estimates take into account cost-conscious design and construction methods recommended by a community-based task force. The district estimates $15 million in state construction assistance for these projects, thus the bond request is $299 million.
When would the schools be completed?
Where will the new schools be located?
How will the new elementary school affect the overcrowding in other elementary schools?
How do you know how many more students are coming?
The district carefully tracks residential development, births and other factors that affect enrollment projections. The district learns where housing developments are planned and keeps in touch with developers to collect the latest information on their timeline for building and for sales. The district tracks carefully how many students come out of which type of development to predict the number of students who will come from new developments.
King County births are tracked to determine how many of those children likely will end up in our schools in kindergarten in five years’ time. The district also knows who is currently in our schools and the likely retention rates through each grade. The district also works with Western Demographics, an outside demographer, to review enrollment and projection methodology.
Can’t you just add more portables if you need more space?
There is a limit to the number of portables we can place on each campus. Each portable has to receive a permit from the local city or King County. Depending on the jurisdiction and on the specific piece of land the school sits on, we may not be able to add any portables at all, or we may be able to add a few. Keep in mind that adding classrooms via portables without expanding other spaces, such as cafeterias, gyms, libraries, and bathrooms, puts pressure on the ability to serve all students in those spaces. Also, portables are not an inexpensive solution. Each classroom portable costs about $450,000 to purchase, prepare the site and install.
Why are you adding Choice Schools at the high school level? Why not a neighborhood school?
We need more space for high school students. There are three ways we can add space for high school students:
- Additions to current schools
- Smaller Choice Schools
- Add a comprehensive neighborhood high school
The 2018 bond calls for both options 1 and 2 as ways to add space for high school students. There are several issues with adding a fifth comprehensive high school. We would need to find and buy about 40 acres of buildable land within the Urban Growth Boundary to be able to build another large, comprehensive high school. It would be very expensive to buy the land, build the school and all the athletic facilities that go with it.
We can also add on to our current high schools, but we do not want to add so many students that our schools grow to more than 2,000 students. That number is one that our community has expressed they are comfortable with as a maximum for high school size.
Choice Schools do not require the same amount of land or the athletic facilities that a comprehensive high school does. (Choice school students may play sports at their neighborhood high school.) As a result, a choice school is less costly to build than a comprehensive high school. Their operational costs are on par with a comprehensive high school since staffing and outfitting a school is determined by the number of students attending the school.
Why do you have to add on to Lake Washington High School now, when the school was just completed a few years ago?
Initial planning for the scope of the new Lake Washington High School building began in 2005 for the 2006 bond measure. At the time, the district still had three-year high schools, one full grade less than it houses now. Work on determining the feasibility of four-year high schools did not begin until 2009, the same year the district broke ground for the new building. So at the time the school was planned, there was no immediate need for additional space.
However, the district did foresee the possibility that growing enrollments and/or a change in grade configuration could create a need for more space at LWHS at some time in the future. As a result, when the school was designed, a second phase addition was planned for the future, when needed. Since the school now both houses an additional grade and is seeing growing enrollment, the need for an addition to the school is here. Also, building space earlier than needed impacts cost of maintenance and operations.
How will the decision be made to replace a building vs. remodel the building?
Before designing a project, each building goes through a study to determine whether the existing building will be remodeled through major renovation or whether it is more appropriate to construct a new building in lieu of remodeling. That determination is made based on a careful review of the costs of the different options, as well as whether the site has space for a replacement of the existing building. Renovating an old building to bring it up to current safety and educational standards can be as costly or more costly than a brand new building. The state guidance is that if the cost to remodel is 80% or more of the costs to rebuild, then the state recommends the school district consider replacement.
Why do you need portables? Why do schools sometimes open with portables?
Portable classrooms are part of the district plan to address changes in demographics and programming needs. They provide flexibility in handling changing school populations. School enrollment changes as neighborhood demographics change. We do not want to overbuild, asking taxpayers for money to pay for classrooms that may remain empty for many years. We also do not want to under build, causing overcrowding and the use of too many portables.
What are the advantages of rebuilding a school?
Rebuilt schools are built to specifications designed to meet today’s educational program.
- Shared spaces between classrooms allow teachers to easily group and regroup students for small group work involving multiple classes, for example.
- Rebuilt schools are designed to be cheaper to operate. They are designed to be energy efficient, saving on energy costs.
- They are designed to be easier to keep clean and maintain, reducing custodial and maintenance costs. Polished concrete floors, for example, eliminate the need to wax floors.
- Rebuilt schools have improved learning environments, with more light and fresh air than older designs.
Are fields, stadiums, and other sports facilities included when a school is rebuilt?
What is the term of the bonds? When will these new bonds and all the old ones be paid off?
The maximum term for the bonds is 20 years. Bonds from past measures have terms that go through 2038. If this measure is passed, the district will sell the bonds as the money is needed for construction, over a three-year period. If the last bonds are sold in 2021, the final bonds will be paid off in 2041, or 20 years later.
How much will the Bond measure cost?
Impact on Schools
What will happen if the measures do not pass?
The school board will make specific decisions based on what funding is available. When faced with cuts, the classroom is always the district’s priority. However, without the EP&O levy, the district's budget would be on average $63.5 million smaller. That reduction would have a significant impact on district programs and services.
If the capital projects levy does not pass, the district would not be able to replace technology equipment that breaks or wears out. It would not be able to renew licenses to online research databases that students use or other online educational tools. It would not be able to replace outdated equipment. It would only make major building repairs in emergencies and that funding would have to come from the general operating fund.
If the bond measure does not pass, the Long-Term Facility Task Force made recommendations for when we can’t build fast enough or if we can’t build at all. These recommendations include temporary strategies such as moving district programs, increasing portables, changing boundaries, reducing special spaces, increasing class size or year-round multi-track schedules. See the complete Long-Term Facility Task Force Recommendations Report.
Voting
- Can I still register to vote?
- When are ballots mailed?
- Where can I drop my ballot?
- What is required for a measure to pass?
Can I still register to vote?
January 15, 2018 is the deadline to register online or by mail to vote. In person registration for new voters ends February 5, 2018. Visit the King County Elections website for more information.
When are ballots mailed?
Where can I drop my ballot?
Ballot drop-off locations are posted on the King County Elections website before each election.
What is required for a measure to pass?
Building Cost-Effective and Efficient Schools
- How does LWSD ensure that schools are built in a cost-effective way?
- What is the Design and Construction Advisory Committee and how does it support LWSD in building cost-effective schools?
- What are some examples of how the work of the Design and Construction Advisory Committee has resulted in cost avoidance guidance for all projects?
- What are some specific examples of cost avoidance strategies for the 2016 bond projects?
How does LWSD ensure that schools are built in a cost-effective way?
LWSD uses the following strategies to leverage resources in planning, design and construction to ensure that we are being effective and efficient with every dollar:
- Created a Design and Construction Advisory Committee to review projects and provide input.
- Design simplification without impacting the quality of the learning.
- Owner, Design Team and Contractor – continuous cost savings review:
- Value Engineering
- Constructability review
- Cross-project sharing and collaboration
- Multiple reviews by an independent cost estimator
- Multiple peer reviews by other Project Team professionals on all systems
- General Contractor/Construction Manager (GC/CM) efficiencies:
- Contractor as a partner to the district.
- Bundling projects
- Navigating market conditions (sub-contractor market and material costs)
- Early and incremental bidding
- Rebidding multiple scopes of work to ensure best pricing
- Pre-fabrication strategies
- Challenging how system and material standards are delivered with equity between projects
What is the Design and Construction Advisory Committee and how does it support LWSD in building cost-effective schools?
The Design and Construction Advisory Committee was formed in 2016 as an outcome of the Long-Term Facility Planning Task Force. This committee of industry experts review each project to ensure alignment with district design standards and its goal of effective and efficient design, construction and operation. Visit the Design and Construction Advisory Committee webpage for more information.
Responsibilities:
- Provide advice on each major school construction (new, rebuild or modernization) project during concept design, schematic design, and design development.
- Review designs for alignment with the district design principles outlined by the Long-Term Facilities Planning Task Force.
- Provide feedback on schedules, budgets, materials, phasing, site layout, risk mitigation, construction and constructability, value engineering and project delivery methods.
Key objectives:
- Provide objective 3rd party analysis of the design and construction decision making process by experienced industry leaders
- Bring team members’ perspective and expertise, providing a critical thinking lens and background to the projects
- Challenge LWSD to think differently about capital expenditures and project planning
- Focus on efficient and effective use of public funds
- Assist in LWSD’s accountability to the efficient and effective intent of the 2016 Bond program
What are some examples of how the work of the Design and Construction Advisory Committee has resulted in cost avoidance guidance for all projects?
Here are some examples of how the work of the Design and Construction Advisory Committee has resulted in cost avoidance guidance for all projects:
- Simplify site layout and building forms to reduce cost and increase efficiency
- Maximize site development to balance grading (cut & fill), and maintain safe access on occupied sites
- Analyze cost benefits of three-story versus two-story elementary schools to reduce footprint
- Minimize site disturbance
- Reduce building volume, simplify roof forms, and simplify building exteriors
- Reduce undue complexity in building materials and systems (rhythm and modularity of building components – i.e., windows and material transitions) – minimize custom solutions
- Seek guidance for complex permitting and reviews by permitting agencies
- Utilize General Contractor/Construction Manager (GC/CM) or other alternative construction options (e.g. Design-Build) to help with procurement strategy and bid package rollout, as appropriate
- Conduct market and trend analysis of the construction market
- Align work and leverage resources – bundle projects with GC/CMs, have project teams work together to maximize the best thinking and extend buying power across multiple projects
What are some specific examples of cost avoidance strategies for the 2016 bond projects?
The table below shows each project and the total cost avoidance due to the Design and Construction Advisory Committee’s recommendations. Cost avoidance does not necessarily reflect total savings; rather, cost avoidance reflects the avoidance of additional costs and mitigation of construction price escalation:
Project Examples of cost avoidance measures | Total Cost Avoidance (Millions) |
Juanita High School Phasing construction results in the project being completed one year early, thereby eliminating an additional year of construction escalation | $21.2 |
New Elementary School in North Redmond Using pre-fabricated building components results in lower costs and quicker assembly | $5.4 |
Redmond Ridge East Elementary School Guiding project planning and logistics to keep project on schedule while abiding by jurisdictional requirements constraining the time of year when earthwork can occur due to environmental concerns Reducing single story elements make for a more efficient structure | $3.5 |
Redmond Ridge Middle School Guiding project planning and logistics to keep project on schedule while abiding by jurisdictional requirements constraining the time of year when earthwork can occur due to environmental concerns | $9.6 |
Mead Elementary School Building 3-story building enables a more efficient and effective use of the site Simplifying roofs and exterior results in cost avoidance | $1.7 |
Kirk Elementary School Guiding navigation of challenging environmentally sensitive issues with the jurisdiction to minimize cost and schedule impacts Analyzing site layout results in maximizing site efficiency and reducing costs | $2.3 |
Total Cost Avoidance | $43.7 |