News

LWHS topping out

The last steel beam for Lake Washington High School’s classroom addition was placed during a topping out ceremony on December 4. The last beam is traditionally accompanied by an American flag and an evergreen branch. 

Events

Twitter

    Facilities Planning 

    File: 6900

    A school district Facilities Master Plan shall be maintained and kept up-to-date. It shall reflect the needs of current and projected instructional procedures and educational programming as identified by the educational staff. The Master Plan shall incorporate the latest issues of the following information as required by State regulations.

    1. Enrollment projections as prepared annually based upon October 1 enrollments by the Superintendent of Public Instruction.
    2. Inventory of current facilities based upon state rated capacities with a summarization showing the need for new classrooms for each of the next five years based upon the enrollment projections.
    3. Site acquisition needs based upon the attendance area maps for future school neighborhoods.
    4. Building fund requirements for providing and furnishing the school facilities required to meet the projections.

    Adopted:
    09/01/19